For Visitors
Mail Us On
PRODUCT LIST
CONTACT US
Descriprion
Color: customizable
Drying time (determined by actual temperature): Surface drying: 8h; Actual drying: 30h
Specification: Component A: 24KG; Component B: 6KG
Applicable to electronic plants, communications, microelectronics plants, precision machinery plants, chemical plants and other industries need anti-static places, especially for the electrostatic requirements of sensitive electronic instruments, integrated circuits and other electronic components of the production workshop and storage area.
Mixing: During storage, component A may have slight precipitation, mix component A well before mixing; proportionally pour component A/component B into the mixing barrel and mix evenly for construction. (Note: When pouring the mixture, do not allow the wall and bottom of the barrel to scrape the adhering mixture to prevent the possible uneven mixing).
Construction methods:
1) Base coat: use base coat to achieve uniform film formation.
2) Mortar layer: use middle coating, mix quartz sand construction to the required thickness.
3) Conductive middle coating: use anti-static primer to roll on the middle coating.
4) Top coat: use antistatic top coat, mixed material rolled or sprayed on the closed antistatic middle coat.
Construction conditions: water content requires less than 8%, relative humidity below 55%, rainy days or relative humidity above 85%, or the temperature is below 10℃, should avoid construction recommended dosage: 0.15 -0.5kg/m 2.
Caution.
Sealed storage: in a cool and ventilated place, moisture-proof and sun-proof.
Application Scenarios
Customer Visit
Certificate
Get Your Free Quote Now!
Related Products
Leave A Message
If you are interested in our products and want to know more details, please leave a message here, we will reply you as soon as we can.